{"id":133,"date":"2022-07-04T11:49:40","date_gmt":"2022-07-04T15:49:40","guid":{"rendered":"https:\/\/tramwaygatineauottawa.ca\/information-en\/documentation-en\/"},"modified":"2023-10-04T16:11:53","modified_gmt":"2023-10-04T20:11:53","slug":"documents","status":"publish","type":"page","link":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/","title":{"rendered":"Documents"},"content":{"rendered":"\n<div class=\"wp-block-cover alignfull is-light is-style-title-banner\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim\"><\/span><img decoding=\"async\" width=\"2560\" height=\"1707\" class=\"wp-block-cover__image-background wp-image-4174 lazyload\" alt=\"\" data-src=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg\" style=\"--smush-placeholder-width: 2560px; --smush-placeholder-aspect-ratio: 2560\/1707;object-position:64% 25%\" data-object-fit=\"cover\" data-object-position=\"64% 25%\" data-srcset=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg 2560w, https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-300x200.jpg 300w, https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-1024x683.jpg 1024w, https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-768x512.jpg 768w, https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-1536x1024.jpg 1536w, https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-2048x1365.jpg 2048w\" data-sizes=\"(max-width: 2560px) 100vw, 2560px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" \/><div class=\"wp-block-cover__inner-container\"><h3 class=\"wp-block-post-title\">Documents<\/h3><\/div><\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-padding-y-large has-accent-background-color has-background\"><div class=\"yoast-breadcrumbs alignwide \"><span class=\"breadcrumbs\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/en\/\" class=\"breadcrumbs__element\">Accueil<\/a> <span class=\"breadcrumbs__separator\">\n        <svg class=\"icon icon-breadcrumb__separator\"><use xlink:href=\"#icon-breadcrumb__separator\"><\/use><\/svg>\n    <\/span> <a href=\"https:\/\/tramwaygatineauottawa.ca\/en\/information\/\" class=\"breadcrumbs__element\">Information<\/a> <span class=\"breadcrumbs__separator\">\n        <svg class=\"icon icon-breadcrumb__separator\"><use xlink:href=\"#icon-breadcrumb__separator\"><\/use><\/svg>\n    <\/span> <span class=\"breadcrumbs__element breadcrumbs__element-current\">Documents<\/span><\/span><\/div><\/div>\n\n\n\n<h1 class=\"wp-block-heading\">Studies and public consultation reports<\/h1>\n\n\n\n\n<p class=\"act-lead wp-block-paragraph\">Here, you will find the documents, studies and public consultation reports related to the Gatineau-Ottawa tram project.<\/p>\n\n\n\n\n<p class=\"wp-block-paragraph\">The information contained in these documents is to be considered in light of when it was generated. Certain elements will be reviewed in greater depth in collaboration with the project\u2019s technical teams. The contents of this page will be updated throughout the project planning period.<\/p>\n\n\n\n<div class=\"act-collapsible is-style-blue-btn\">\n<h2 class=\"wp-block-heading act-collapsible__heading has-secondary-color has-text-color\">213-2017 opportunity study  <strong style=\"color: var(--color--secondary); font-family: var(--font-family--heading); font-size: var(--font-size--h2); background-color: var(--color--white); display: inline !important;\"><\/strong><\/h2>\n\n\n\n<div class=\"act-collapsible__content\"><div class=\"act-collapsible__content-inner\">\n<p class=\"wp-block-paragraph\">Together with its partners (minist\u00e8re des Transports et de la Mobilit\u00e9 durable (MTMD), National Capital Commission (NCC), City of Ottawa and Ville de Gatineau), the STO mandated the Roche Genivar consortium to prepare an opportunity study in order to review the prospect of a new reliable, efficient and appealing public transit system in Gatineau\u2019s west end. Three scenarios and their variants were reviewed at the time:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Enhancing the existing bus system.<\/li>\n\n\n\n<li>Installing a dedicated axis along chemin d\u2019Aylmer \/ boulevard Alexandre-Tach\u00e9 with variants, including using chemin Lucerne behind Universit\u00e9 du Qu\u00e9bec en Outaouais (UQO) or the Champlain Bridge to downtown Ottawa.<\/li>\n\n\n\n<li>Installing a dedicated axis along boulevard des Allumeti\u00e8res with a variant involving the use of chemin McConnell and boulevard du Plateau.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The review of current and future needs made it clear that it would be necessary to invest in a dedicated, reliable and efficient public transit system in Gatineau\u2019s west end. Moreover, because the west end\u2019s configuration is not conducive to meeting the need through a single dedicated axis, a combination of dedicated measures along the Allumetti\u00e8res and Aylmer\/Tach\u00e9 axes would be required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The metropolitan context and the importance of transportation (home-work) require that any future public transit system be integrated with Ottawa\u2019s. Given the need to integrate the systems and the longer term vision for the development of the greater Gatineau-Ottawa metropolitan area, the option that warrants more extensive study is the tram.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Opportunity study reports<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Forum &#8211; September 2016<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/youtu.be\/zdWQDkChQLc\" target=\"_blank\" rel=\"noreferrer noopener\">Transport et territoires : un mariage de raison?<\/a>&nbsp;\u202f(in French only)<br>Paul Lewis, Doyen et professeur &#8211; Facult\u00e9 d&#8217;am\u00e9nagement &#8211; Universit\u00e9 de Montr\u00e9al&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/youtu.be\/qwXTXZVr2wE\" target=\"_blank\" rel=\"noreferrer noopener\">Vision du d\u00e9veloppement de la Ville de Gatineau<\/a>&nbsp;\u202f(in French only)<br>Catherine Marchand, Directrice de l&#8217;urbanisme et du d\u00e9veloppement \u00e9conomique \u2013 Ville de Gatineau&nbsp;<br>&nbsp;<br><a href=\"https:\/\/youtu.be\/Once8RrIiks\" target=\"_blank\" rel=\"noreferrer noopener\">Coordonner transport et urbanisme dans la r\u00e9gion d&#8217;Ottawa-Gatineau : contexte et enjeux de gouvernance et de planification m\u00e9tropolitaine<\/a>&nbsp;\u202f(in French only)<br>Mario Gauthier, Professeur au D\u00e9partement des sciences sociales &#8211; Universit\u00e9 du Qu\u00e9bec en Outaouais&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/youtu.be\/gxJsMaBDh4Q\" target=\"_blank\" rel=\"noreferrer noopener\">Avancement de l&#8217;\u00e9tude de l&#8217;ouest<\/a>&nbsp;\u202f(in French only)<br>Sandrine Poteau, Charg\u00e9e de projet aux strat\u00e9gies et d\u00e9veloppement &#8211; Soci\u00e9t\u00e9 de transport de l&#8217;Outaouais&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/youtu.be\/4qvn5wt7V1I\" target=\"_blank\" rel=\"noreferrer noopener\">Autobus et tramway : mythes et r\u00e9alit\u00e9s<\/a>&nbsp;\u202f(in French only)<br>Vincent Ermatinger, Vice-pr\u00e9sident adjoint \/ Transport, Qu\u00e9bec &#8211; WSP&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Public consultations \u2013 November 2016<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/Rapport_de_consultation_novembre2016.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Rapport de consultation &#8211; \u00c9tude pour un syst\u00e8me de transport collectif performant dans l&#8217;ouest de Gatineau<\/a> \u202f(in French only)<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Survey \u2013 December 2016<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/ETUDE_DE_L_OUEST_Rapport_d_analyse-STO.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Rapport de la firme L\u00e9ger<\/a> \u202f(in French only)<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Summary<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/Finale_E_2018_02_14_Etude_de_louest_-_Document_sommaire_pour_public_-_modif-e.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Study of Needs and Solutions for a Structuring Public Transit System in Gatineau&#8217;s West End &#8211; Conclusions of Study<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Full reports<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/Etude_des_besoins_1_Rapport_d_etape_final_Partie_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">\u00c9tude des besoins partie 1<\/a> \u202f(in French only)<br><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/Etude_des_besoins_2_Rapport_d_etape_final_Partie_2.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">\u00c9tude des besoins partie 2<\/a> \u202f(in French only)<br><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/Etude_des_solutions_1_Rapport_d_etape_final_Partie_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">\u00c9tude des solutions partie 1<\/a> \u202f(in French only)<br><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/Etude_des_solutions_2_Rapport_d_etape_final_Partie_2.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">\u00c9tude des solutions partie 2<\/a> \u202f(in French only)<\/p>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"act-collapsible is-style-blue-btn\">\n<h2 class=\"wp-block-heading act-collapsible__heading has-secondary-color has-text-color\">2018-2021 complementary study<\/h2>\n\n\n\n<div class=\"act-collapsible__content\"><div class=\"act-collapsible__content-inner\">\n<p class=\"wp-block-paragraph\">The purpose of the complementary study was, among other things, to identify the optimal solution (mode and circuit) for meeting the transportation needs of residents in Gatineau\u2019s west end for the next 30 to 50 years in a context of population growth, road congestion and the importance of interprovincial exchanges. The solution needed to reflect current political commitments to the electrification of transportation, sustainable mobility and integrated planning of transportation and land use development, from a local and metropolitan point of view.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Complementary study reports<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Consultations and workshops \/ advisory committees \u2013 November and December 2018<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/Rapport-synthe\u0300se-des-consultations.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Rapport synth\u00e8se des consultations<\/a> (in French only)<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Workshop \/ advisory committees \u2013 March 2019<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/CR_rencontre_comite\u0301s_consultatifs_20190313_-_V2.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Compte-rendu des ateliers de travail<\/a> (in French only)<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Public consultations on the five scenarios selected \u2013 June 2019<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/Rapport-de-consultation_Etude-de-l_ouest.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Rapport complet<\/a> (in French only)<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Public consultations on the insertion options for downtown Ottawa \u2013 June and July 2020<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/08\/RAPPORT-DE-CONSULTATION-STO-ANGLAIS-7-aou\u0302t-2020-vf.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Full report<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Announcement of the optimal solution for the dedicated public transit system &#8211; May 12, 2021<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The recommended mode and circuit based on this study were released in May 2021. The comparative analysis of the different scenarios under study finds that the optimal dedicated public transit technical solution for linking Gatineau\u2019s west end to the Gatineau and Ottawa downtowns is the all-tram scenario, with insertion in downtown Ottawa through a tunnel under Sparks Street or at grade on Wellington Street.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/en\/pres_solution_finale_edo_breffage_technique_v10-e-2\/\" target=\"_blank\" rel=\"noreferrer noopener\">Technical Briefing presentation<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Final report &#8211; Conclusions and recommandations<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The final report, tabled in 2021, is a summary of the key stages of the complementary study, and describes how the solution identified as optimal meets the study\u2019s main objectives. The proposed recommendations will help orient and expand on the next steps in the analysis, development, detailed engineering and implementation of this project, all of which are expected to extend over a ten-year period.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As with all major long-term projects, the dedicated public transit project will continue to evolve and adjust as it develops. As a result, some of the information in this report is out of date, and will be reassessed in the upcoming pre-project phases:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the project timeline;<\/li>\n\n\n\n<li>the integration of the dedicated public transit system in downtown Gatineau (rue Laurier) and Ottawa, and on the Portage Bridge;<\/li>\n\n\n\n<li>project cost estimates (design, construction, testing and start up). Given that these were indexed using an annual inflation rate of 2%, they will have to be revised because the inflation rates for 2021 and 2022 for the construction sector ended up being higher. In addition, the costs have to be revised upwards to take into account the fact that the initially anticipated timeline had to be extended.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Certain elements had to be redacted because of their sensitivity, such as information that could compromise future calls for tenders or lead to land speculation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The complementary study is the outcome of collaboration among the STO and the different project partners: Quebec\u2019s minist\u00e8re des Transports et de la Mobilit\u00e9 durable (MTMD), the National Capital Commission (NCC), Ville de Gatineau and the City of Ottawa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/09\/TGO_Rapport-6_Final_Anglais_VF_230901.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Final report of the complementary study<\/a><\/p>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<div class=\"wp-block-group alignfull\">\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-small-font-size wp-block-paragraph\"><strong><em>Who can view this page?<\/em><\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size wp-block-paragraph\"><em>This content is intended for the public covered by the exceptions of the Charter of the French language and its regulations. If you read on, you confirm that you fall within one of these <a href=\"https:\/\/www.quebec.ca\/en\/government\/policies-orientations\/french-language\/modernization-charter-french-language#c214034\" target=\"_blank\" rel=\"noreferrer noopener\">exceptions<\/a>.<\/em><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Studies and public consultation reports The information contained in these documents is to be considered in light of when it was generated. Certain elements will be reviewed in greater depth in collaboration with the project\u2019s technical teams. The contents of this page will be updated throughout the project planning period.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":132,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_crdt_document":"","inline_featured_image":false,"footnotes":""},"class_list":["post-133","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Documents - Gatineau-Ottawa tram<\/title>\n<meta name=\"description\" content=\"Here, you will find the documents, studies and public consultation reports related to the Gatineau-Ottawa tram project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Documents - Gatineau-Ottawa tram\" \/>\n<meta property=\"og:description\" content=\"Here, you will find the documents, studies and public consultation reports related to the Gatineau-Ottawa tram project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/\" \/>\n<meta property=\"og:site_name\" content=\"Tramway Gatineau-Ottawa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Tramway-Gatineau-Ottawa-108250335274458\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-04T20:11:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/information\\\/documents\\\/\",\"url\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/information\\\/documents\\\/\",\"name\":\"Documents - Gatineau-Ottawa tram\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/information\\\/documents\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/information\\\/documents\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg\",\"datePublished\":\"2022-07-04T15:49:40+00:00\",\"dateModified\":\"2023-10-04T20:11:53+00:00\",\"description\":\"Here, you will find the documents, studies and public consultation reports related to the Gatineau-Ottawa tram project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/information\\\/documents\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/information\\\/documents\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/information\\\/documents\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/information\\\/documents\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Information\",\"item\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/information\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Documents\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/\",\"name\":\"Tramway Gatineau-Ottawa\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/#organization\",\"name\":\"Tramway Gatineau-Ottawa\",\"url\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Logo.svg\",\"contentUrl\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Logo.svg\",\"caption\":\"Tramway Gatineau-Ottawa\"},\"image\":{\"@id\":\"https:\\\/\\\/tramwaygatineauottawa.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Tramway-Gatineau-Ottawa-108250335274458\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCG-j155C6UYBLFRQM2dieKQ\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/tramwaygatineauottawa\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Documents - Gatineau-Ottawa tram","description":"Here, you will find the documents, studies and public consultation reports related to the Gatineau-Ottawa tram project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/","og_locale":"en_US","og_type":"article","og_title":"Documents - Gatineau-Ottawa tram","og_description":"Here, you will find the documents, studies and public consultation reports related to the Gatineau-Ottawa tram project.","og_url":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/","og_site_name":"Tramway Gatineau-Ottawa","article_publisher":"https:\/\/www.facebook.com\/Tramway-Gatineau-Ottawa-108250335274458","article_modified_time":"2023-10-04T20:11:53+00:00","og_image":[{"url":"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/","url":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/","name":"Documents - Gatineau-Ottawa tram","isPartOf":{"@id":"https:\/\/tramwaygatineauottawa.ca\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/#primaryimage"},"image":{"@id":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/#primaryimage"},"thumbnailUrl":"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg","datePublished":"2022-07-04T15:49:40+00:00","dateModified":"2023-10-04T20:11:53+00:00","description":"Here, you will find the documents, studies and public consultation reports related to the Gatineau-Ottawa tram project.","breadcrumb":{"@id":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/#primaryimage","url":"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg","contentUrl":"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2023\/03\/getty-images-t3SQpOmNBQc-unsplash-scaled.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/documents\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/tramwaygatineauottawa.ca\/en\/"},{"@type":"ListItem","position":2,"name":"Information","item":"https:\/\/tramwaygatineauottawa.ca\/en\/information\/"},{"@type":"ListItem","position":3,"name":"Documents"}]},{"@type":"WebSite","@id":"https:\/\/tramwaygatineauottawa.ca\/en\/#website","url":"https:\/\/tramwaygatineauottawa.ca\/en\/","name":"Tramway Gatineau-Ottawa","description":"","publisher":{"@id":"https:\/\/tramwaygatineauottawa.ca\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tramwaygatineauottawa.ca\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/tramwaygatineauottawa.ca\/en\/#organization","name":"Tramway Gatineau-Ottawa","url":"https:\/\/tramwaygatineauottawa.ca\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/tramwaygatineauottawa.ca\/en\/#\/schema\/logo\/image\/","url":"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/06\/Logo.svg","contentUrl":"https:\/\/tramwaygatineauottawa.ca\/wp-content\/uploads\/2022\/06\/Logo.svg","caption":"Tramway Gatineau-Ottawa"},"image":{"@id":"https:\/\/tramwaygatineauottawa.ca\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Tramway-Gatineau-Ottawa-108250335274458","https:\/\/www.youtube.com\/channel\/UCG-j155C6UYBLFRQM2dieKQ","https:\/\/www.linkedin.com\/company\/tramwaygatineauottawa"]}]}},"jetpack_sharing_enabled":true,"publishpress_future_action":{"enabled":false,"date":"2026-05-05 09:35:09","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"translation_priority","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/tramwaygatineauottawa.ca\/en\/wp-json\/wp\/v2\/pages\/133","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tramwaygatineauottawa.ca\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tramwaygatineauottawa.ca\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tramwaygatineauottawa.ca\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tramwaygatineauottawa.ca\/en\/wp-json\/wp\/v2\/comments?post=133"}],"version-history":[{"count":1,"href":"https:\/\/tramwaygatineauottawa.ca\/en\/wp-json\/wp\/v2\/pages\/133\/revisions"}],"predecessor-version":[{"id":4870,"href":"https:\/\/tramwaygatineauottawa.ca\/en\/wp-json\/wp\/v2\/pages\/133\/revisions\/4870"}],"up":[{"embeddable":true,"href":"https:\/\/tramwaygatineauottawa.ca\/en\/wp-json\/wp\/v2\/pages\/132"}],"wp:attachment":[{"href":"https:\/\/tramwaygatineauottawa.ca\/en\/wp-json\/wp\/v2\/media?parent=133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}